Aboitiz Power: Providing base load power to Mindanao

August 25, 2015

Mindanaoans can look forward to brighter days and nights with the full operation of Therma South, Inc.’s (TSI) first 50 MegaWatt (MW) unit by September this year. The Island has wallowed in the dark for years with the insufficient power supply provided by its fledgling hydropower sources that establishment of a base load power has been highly anticipated by consumers.

Back to articles
Other News